Ahmednagar : With only 50 odd days away for the monsoons, water conservation activities have gained momentum in Ahmednagar District. Under Jalyukta Shivar Abhiyan, desiltation of 555 Village Tanks or Percolation Tanks have been carried out till date. About 6,86,672 cubic meter silt has been removed from these water bodies through public participation.
As per information released from the District Collectors Office, desiltation alone will help to store about 686 TCM (Thousand Cubic Meter) more water in these existing water structures.
Ahmednagar District : JSA Progress
Villages Selected : 279
Work Initiated : 2923
Work Completed (Till 16th April) : 1748
Work in-progress : 1175
Total Expense till date : Rs. 32.56 Crore
Block (Taluka) wise Desiltation Activites
Block : Tanks – Silt Removed (in cubic meters)
Ahmednagar: 26 tanks – 51282 m3
Parner: 61 tanks – 89734 m3
Pathardi: 84 tanks – 87396 m3
Karjat: 26 tanks – 27487 m3
Shrigonda: 32 tanks – 32446 m3
Jamkhed: 93 tanks – 142221 m3
Shrigonda: 2 tanks – 2100 m3
Rahuri: 19 tanks – 18121 m3
Nevasa: 15 tanks – 12494 m3
Shevgaon: 29 tanks – 36661 m3
Sangamner: 99 tanks – 97986 m3
Akole: 18 tanks – 36155 m3
Kopargaon: 27 tanks – 20530 m3
Rahata: 24 tanks – 32059 m3
Total: 555 tanks – 686672 m3
AMSTERDAM — This museum is floating in outer space. In front of you, there is a line of stunning European old master paintings to observe and ex...
Once women resolve to do something, they get things done! Inhabitants from Shripatraywadi recently witnessed this. With the help from the local gro...
Four years ago, a young girl from the village Shitalwadi, Taluk Ramtek registered for Tanishka forum. She led various social initiatives, honed ...